|
Miscellaneous
|
|
Allegion Support Center
|
|
Microsoft Data Access Components (MDAC) 2.8
|
|
BITSADMIN – utility to monitor the status of auto update
downloads
NOTE: The command line to run this
utility is “bitsadmin /list /allusers” from the cmd prompt.
|
|
JUNCTION
– utility
used in terminal server installs when the customer does not want PWS
installed on the c drive. Refer to
the Junction Program Instructions in the documentation area below.
|
|
INSTALL PWS AUTO UPDATER – download and run this
batch file on a user’s machine if pwsupdatewindowsservicec++.exe is NOT
running AND the user has OEW version 2.14 or later.
NOTE: To check if pwsupdatewindowsservicec++.exe is
running, bring up task manager, click the Processes tab, ensure the
option to view processes by all users is enabled, and look for the exe in
the list.
NOTE: This is a zip file. You will have to download to user’s
desktop, unzip, and then double-click on installwindowsservice.bat to run
the installation
|
|
TEST PWS AUTO UPDATER –
***FOR INTERNAL
USE ONLY***
Download and run this exe to uninstall the normal
PWS update windows service and to install the test windows service. The test windows service downloads
updates from a test location so that auto updates can be tested prior to
release.
NOTE: To check if pwsupdatewindowsserviceTEST.exe is
running, bring up task manager, click the Processes tab, ensure the
option to view processes by all users is enabled, and look for the exe in
the list.
|
|
|
|
Installs
|
|
Full Install –
version 2.76 Updated 09/30/2018
NOTE:
FOR ALL VERSIONS STARTING WITH 2.19.
The install will no longer automatically launch the vcredist_x86
installation. This must be
manually downloaded using link below and executed following the install.
NOTE:
This install will check if the user has .NET 2.0 installed. If not, you will receive a message and
be redirected to a Microsoft website.
From the site, click the link “Download x86 version” in the .NET
framework 2.0 redistributable area.
|
|
Vcredist_x86
NOTE:
FOR ALL VERSIONS STARTING WITH 2.19.
The install will no longer automatically launch the vcredist_x86
installation. This must be
manually downloaded and executed following the install.
|
|
Update to 2.76 (used to update all previous
versions to 2.76) - Note: update.txt should be set to 302 after update
|
|
Partial update- 1 to 2.76 (used to update 2.76 to latest
versions) - Note: update.txt should be set to 303 after update
|
|
Partial update- 2 to 2.76 (used to update 2.76 to latest
versions) - Note: update.txt should be set to 304 after update
|
|
Partial update- 3 to 2.76 (used to update 2.76 to latest
versions) - Note: update.txt should be set to 305 after update
|
|
Partial update- 4 to 2.76 (used to update 2.76 to latest
versions) - Note: update.txt should be set to 306 after update
|
|
STECM version 7.25 (updated
01/06/2019)
|
|
Crystal Reports Install
|
|
Documentation
|
|
Pre-Installation Instructions – Stand Alone
|
|
Pre-Installation Instructions – Terminal Server
|
|
Pre-Installation Instructions – LAN
|
|
Installation
Instructions – SSC users – Note: ALL SSC users should use these instructions
for installing
|
|
Installation Instructions – Stand Alone
|
|
Installation
Instructions – Terminal Server
|
|
Installation Instructions - LAN
|
|
Upgrade
Instructions – Stand Alone
|
|
Upgrade
Instructions - LAN
|
|
System
Worksheet
|
|
System Requirements
|
·
|
Junction Program Instructions
|
·
|
|